Certainteed corporation and representatives of owners of buildings on which the siding had been installed reached a proposed class action settlement.
Certainteed cement siding installation guide.
Click here to learn more from certainteed.
Use six nails and four spots of asphalt roofing cement for every full shingle for every full shingle as shown below.
Staples must not be used.
An alternative to using new construction window starter is to use 1 2 j channel as a starter.
Make a cut 1 1 2 at the 90 bend of the lineal face and inside locking edge.
Overlap the lineals 1 by fitting the notched lineal over the un notched lineal.
Gap where the end meets the corner board photo 7 inset and make sure the other end lands on a stud line.
Install the next piece so its end butts lightly against the first photo 7 inset.
Xx allow a minimum of 1 2 above roof lines porches decks etc.
Certainteed fiber cement siding installation guides contain similar admonitions.
If using screws to fasten fiber cement siding such as to metal studs be sure that at least three threads penetrate the studs.
Trim 1 1 2 from the nail flange and receiving channel.
Apply a coat of mortar.
Please print this document by clicking the print icon in the web viewer.
Continuing drying for the day day 6.
Adhesives to install fiber cement siding.
Install 2 layers of weather resistant barrier.
Provides important advice for building owners troubled by gaps that appear in fiber cement exterior siding after the product has been installed and in service for some time.
Measure and cut to length the first piece of siding and nail it in place photo 7.
Create a scratch coat in the mortar let dry for the day.
Take a look at our color selection and use our six basic color combination principles as your guide.
Xx leave 1 8 gap between siding and trim surrounding windows and doors.
Nails must be round head non corrosive and either double hot dipped galvanized or stainless steel.
Apply 1 spots of asphalt roofing cement under each corner and at about 12 to 13 in from each edge.
Continuing drying for the day.
Asphalt roofing cement should meet astm d 4586 type ii.
6 clearances xx hold back siding a minimum of 6 above the finished grade.
Xx do not install fiber cement directly in contact with surfaces that collect water.
The settlement is intended to resolve disputes between the parties about the performance of the siding.
Use six nails and four spots of.
Certainteed offers over 40 color choices for your personal vision for your home s exterior design.